35MW Waste Heat Utilization Back-type Steam Turbine Generator Project DCS for Guizhou Chitianhua Paper Co., Ltd.
Project Background
> Distributed Control System (DCS) for 1×35MW Waste Heat Utilization Back-type Steam Turbine Generator Unit Project of Guizhou Chitianhua Paper Co., Ltd.

Configuration Scheme
● Controller AS410 redundant controller + high-end IO card ET200SP HA

● Advanced operating platform SPPA-T3000

● I/O points: 900 points

User benefits and project significance
● The excellent 410 controller and high-end ET200SP HA card provide more stable protection for the generator set production line

● The advanced SPPA-T3000 distributed control system provides perfect functions for power plant control systems. Flexible and excellent system functionality, embedded component service ECS® architecture and standardized communication ensure that SPPA-T3000 fully meets all requirements of power plant control systems.